nivo slider image

Techflow Marine Delivers OSX-3 FPSO Tandem Offloading System

March 4th, 2013

This is one of the largest offloading systems of its kind, storing 360m of 20” double carcass hose. The system will operate within block BM-C-39 of the Campos Basin, offshore Brazil, on the Waikiki Pero Inga fields.

The FPSO is moored in approximately 110 meters water depth, has a storage capacity of 1.3 million barrels and is capable of processing 100,000 BOPD of heavy oil from the Campos Basin reservoir.

MODEC was responsible for the engineering, procurement, construction, mobilization, installation, and commissioning of the FPSO, including topsides, processing equipment, hull and marine systems, and the external turret mooring (designed and constructed by its subsidiary, SOFEC).

The FPSO is due to reach First Oil in December 2013.

OSX-3 FPSO Key Information

Unit Name
OSX-3 FPSO
First Oil
December 2013
Client
OSX 3 Leasing B.V.
Field Location
Waikiki Pero Inga Fields
Country
Brazil
Water Depth
110 m
New/Conv
Conversion
Mooring Type
SOFEC External Turret
Storage Capacity
1,300,000 bbls
Oil Production
100,000 bopd
Water Injection
150,000 bwpd