nivo slider image

Enping FPSO Tandem Mooring & Offloading System

March 4th, 2014

Techflow Marine has delivered its first Tandem Offloading System to the Chinese market. Enping FPSO will be operated by China National Offshore Oil Corporation (CNOOC) in the eastern part of the South China Sea.

On August 23th 2014, “Hai Yang Shi You 118”, departed from Dailjan Shipbuilding Industry Corp. (DSIC) 20 days ahead of schedule.

The FPSO, named “Hai Yang Shi You 118”, has a processing capacity of 56,000 barrels of crude oil per day and is equipped to operate for 15 years without drydocking. The floating production facility, which has an operational life of 30 years, measures 743 feet (226.64 meters) in length and 165 feet (50.5 meters) in height and can work in water depths of between 32 feet and 984 feet (10 meters and 300 meters).